Monday, July 25, 2016

Curb and Gutter Replacement to Begin on South Side of Ronald Road.

Work Completed Last Week, July 18th to July 22nd
·         Continued with storm sewer construction
·         Continued water service replacements along Ronald Road

Work Anticipated to be completed Next week, July 25th to July 29th 
·         Complete storm sewer construction
·         Begin storm sewer service installation
·         Complete water service replacements along Ronald Road from Greenwood Road to Glendale Road
·         Perform required testing and receive necessary approvals prior to placing the new water main into service within the second section of new water main installed along Glendale Road from Ronald Road to Warren Road.
·         Begin removing existing concrete curb & gutter along Ronald Road from Greenwood Road to Glendale Road, south side of roadway.

The contractor will begin removing the concrete curb & gutter along the SOUTH side of Ronald Road from Greenwood Road to Glendale Road. During this construction operation, the concrete curb & gutter in front of each home will be removed. Temporary stone ramps will be installed at each drive to provide access. The amount of time each resident is restricted from using their driveway during the removal process should be limited.

It is anticipated the contractor will begin pouring the new concrete curb & gutter on the south side of Ronald Road from Greenwood Road to Glendale Road next week as well. During this process, residents will be restricted from using their driveways for approximately 1 week to allow for the curb & gutter to be installed and proper curing time of the concrete. Residents will be able to park on the opposite side of the street during non-working hours. During working hours, we request you park on adjacent streets outside the construction zone. Residents will be notified via letter regarding the day access will be restricted and timeframe for access being restored.

Again this past week, there were several emergency water shut-downs due to the contractor hitting existing water services while performing the water service replacements. Unfortunately this is part of construction. However, please be assured we have had continual discussions regarding this issue with the contractor and requested great care be taken while excavating. Should an emergency water shut down need to be performed, we will notify you as quickly as possible.

Thank you again for all your patience, understanding, and cooperation as you live within a construction area.

Friday, July 15, 2016

Underground Utility Improvements Continue

Work Completed Last Week, July 11th to July 15th
·         Continued with storm sewer construction
·         Completed sanitary sewer service replacements
·         Completed sanitary sewer repairs
·         Received necessary approvals to place the new water main into service along Ronald Road from Greenwood Road to Glendale Road
·         Began water service replacements along Ronald Road

Work Anticipated to be completed Next week, July 18th to July 25th
·         Complete storm sewer construction
·         Begin storm sewer service installation
·         Continue water service replacement along Ronald Road from Greenwood Road to Glendale Road
·         Perform required testing and received necessary approvals prior to placing the new water main into service within the second section of new water main installed along Glendale Road from Ronald Road to Warren Road.
·         Depending on work progress, begin removing existing concrete curb & gutter along Ronald Road

Now that the necessary approvals are received to place the newly installed water main into service along Ronald Road from Greenwood Road to Glendale Road, the contractor has began replacing water services to individual homes. Water services will be replaced from the new water main to the existing valve and box located in front of each home. During the water service replacement, water to individual homes will be shut-off for approximately 2-3 hours while the transition from the old service to the new service is made. The contractor will notify each resident individually regarding the approximate time and day of the water shut-off prior to turning off the water.

Depending on when the required approvals are received, the contractor may begin water service placements along Glendale Road from Ronald Road to Warren Road.

The contractor is hoping to complete the mainline storm sewer installation by the end of next week.

Depending on work progress, the contractor may begin removing the concrete curb & gutter along Ronald Road from Greenwood Road to Glendale Road. During this construction operation, the concrete curb & gutter in front of each home will be removed. Temporary stone ramps will be installed at each drive to provide access. The amount of time each resident is restricted from using their driveway during the removal process should be limited.

During the past week, there were several emergency water shut-downs due to the contractor hitting existing water services while performing the water service replacements. Unfortunately this is part of construction. However, please be assured we have discussed this issue with the contractor and requested great care be taken while excavating. Should an emergency water shut down need to be performed, we will notify you as quickly as possible.

Thank you again for all your patience, understanding, and cooperation as you live within a construction area.

 

Friday, July 1, 2016

Storm and Sanitary Sewer Improvements Continue. Water Service Replacements to Begin

Work Completed Last Week, June 27th to July 1st  
·         Continued with storm sewer construction
·         Continued with sanitary sewer service replacements
·         Received necessary approvals to placing new water main into service along the first section of new water main installed along Ronald Road from Greenwood Road to Glendale Road
·         General site clean-up prior to July 4th Holiday

Work Anticipated to be completed Next week, July 4th to July 8th  
·         No work on-site on July 4th
·         Continue with storm sewer construction
·         Complete sanitary sewer service replacements
·         Complete required sanitary sewer repairs.
·         Continue to perform required testing and received necessary approvals prior to placing the new water main into service within the second section of new water main installed along Glendale Road from Ronald Road to Warren Road.

The contractor is expected to complete the sanitary sewer service replacement and mainline repairs by the end of next week. This is a little later than anticipated, but the contractor uncovered a few unexpected issues as they were performing the work.

The contractor will continue to install the new storm sewer along the project site.

The contractor received the required approvals to place the new water main into service along the first section of newly installed water main, Ronald Road from Greenwood Road to Glendale Road. The contractor anticipates beginning installation of water services to individual homes next week. Water services will be replaced from the new water main to the existing valve and box located in front of each home. During the water service replacement, water to individual homes will be shut-off for approximately 2-3 hours while the transition from the old service to the new service is made. The contractor will notify each resident individually regarding the approximate time and day of the water shut-off prior to turning off the water.

The contractor will not be on-site over the July 4th Holiday. Have a safe and enjoyable Holiday Weekend!!!

Friday, June 24, 2016

Storm Sewer and Sanitary Sewer Work Continues

Work Completed Last Week, June 20th to June 24th  
·         Continued with storm sewer construction
·         Continued with sanitary sewer service replacements

Work Anticipated to be completed Next week, June 27th to July 1st   
·         Continue with storm sewer construction
·         Complete sanitary sewer service replacements
·         Complete required sanitary sewer repairs.
·         Continue to perform required testing and received necessary approvals prior to placing the new water main into service.

 The contractor will continue to work with two crews on-site to complete the storm sewer installation and sanitary sewer service replacements as required.

The contractor is anticipating to complete the necessary sanitary sewer service replacements and sanitary sewer repairs by the end of the next week, prior to the July 4th Holiday.

The contractor is continuing to perform the required testing needed prior to placing the new water main into service and begin replacing the water services to individual homes. They anticipate water service replacements will begin following the July 4th Holiday.

Thanks again for all your patience and understanding.

Friday, June 17, 2016

Storm Sewer Installation and Sanitary Sewer Service Replacements Continue

Work Completed Last Week, June 13th to June 17th  
·         Continued with storm sewer construction
·         Continued with sanitary sewer service replacements
·         Began performing required testing prior to placing the new water main into service

Work Anticipated to be completed Next week, June 20th to June 24th  
·         Continue with storm sewer construction
·         Continue with sanitary sewer service replacements
·         Complete required testing and received necessary approvals prior to placing the new water main into service.

The contractor will continue to work with two crews on-site to complete the storm sewer installation and sanitary sewer service replacements as required.

It is anticipated the contractor will receive the required approvals to place the new water main into service in the next few weeks. Once all the tests have passed and the approvals have been received, the contractor will begin water service replacements to each individual home. They anticipate this work beginning the week of July 27th.

Thank you for all your patience and understanding as you live in a very busy construction site that makes travelling through the neighborhood difficult and dealing with the construction dirt and dust that comes with a project of this size.

Friday, June 10, 2016

Water Main Installation Completed

Work Completed Last Week, June 6th to June 10th
•             Completed water main installation
•             Made connection to existing water main along Greenwood Road
•             Started sanitary sewer replacements

Work Anticipated to be completed Next week, June 13th to June 17th
•             Continue with storm sewer construction
•             Continue with sanitary sewer service replacements
•             Begin performing required testing prior to placing new water main into service.

 The contractor completed the water main installation this week and will begin performing the required tests and necessary approvals for placing the newly installed water main into service. Once all the tests have passed and approvals are received, the contractor will begin replacing the water services to each individual homes.

Next week the contractor will continue replacing sanitary sewer services scheduled to be replaced and installation of the new storm sewer.

Thank you for all your patience and understanding as the construction project continues.

Friday, June 3, 2016

Water Main Continues.

Work Completed Last Week, May 30th to June 3rd
·         Continued with water main installation along Ronald Road and Glendale Road
·         Begin water main construction within cul-de-sacs
·         Directional boring of new water main under Greenwood Road

Work Anticipated to be completed Next week, June 6th to June 10th  
·         Continue with water main installation along Ronald Road and Glendale Road
·         Complete water main within cul-de-sacs
·         Make connection to existing water main along Greenwood Road
·         Start sanitary sewer construction

The contractor started excavating for boring pits and directional boring the new water main and casing under Greenwood Road this week. The intersection of Ronald Road and Greenwood Road was reduced to one lane to facilitate this construction. Everything will be done to open all the lanes as quickly as possible.

The contractor also worked in the intersection of Ronald Road and Glendale Road this week. During this construction, the entire intersection was closed to through traffic.

If all goes as planned, the contractor anticipates having the water main completed by the end of next week. The contractor will then begin performing the required tests and receive the necessary approvals for placing the newly installed water main into service. Once all the tests have passed and approvals are received, the contractor will begin replacing the water services to each individual homes.

The contractor has started, and will continue for the foreseeable future, having 2 crews working on the site. The crews will be working on different aspects of the project. Every effort will be made ensure one lane of traffic is open along Ronald Road and Glendale Road within the various work locations. Should future roadway /intersection closures be required, residents will be notified. You may be requested to use alternate routes to avoid areas of the work zone. Please use caution as you travel through the work zones.

Thank you again for your patience and understanding as you navigate through the various lane and intersection closures along the project site.