Completed water service replacements along
Ronald Road from Greenwood Road to Glendale Road
·
Began removal replacement of existing concrete
curb & gutter along Ronald Road from Greenwood Road to Glendale Road, south
side of roadway.
·
Completed water service replacements along
Ronald Road
Work Anticipated to be completed This week, August 1st
to August 5th
·
Complete storm sewer construction
·
Begin storm sewer service installation
·
Perform required testing and receive necessary
approvals prior to placing the new water main into service within the second
section of new water main installed along Glendale Road from Ronald Road to
Warren Road.
·
Continue concrete curb & gutter and driveway
replacements on the south side of Ronald Road from Greenwood Road to Glendale
Road
The contractor will continue removing the concrete curb
& gutter along the SOUTH side of Ronald Road from Greenwood Road to
Glendale Road. During this construction operation, the concrete curb &
gutter in front of each home will be removed. Temporary stone ramps will be
installed at each drive to provide access. The amount of time each resident is
restricted from using their driveway during the removal process should be
limited.
The contractor will continue pouring the new concrete curb
& gutter on the south side of Ronald Road from Greenwood Road to Glendale
Road this week as well. During this process, residents will be restricted from
using their driveways for approximately 1 week to allow for the curb &
gutter to be installed and proper curing time of the concrete. Residents will
be able to park on the opposite side of the street during non-working hours.
During working hours (7:00 AM to 5:00 PM), we request you park on adjacent streets outside the
construction zone. Residents will be notified via letter regarding the day
access will be restricted and timeframe for access being restored.
Thank you for all your patience and understanding as the
roadway improvements have continued and residents are with access to their
driveways during the concrete pouring and curing process. It is anticipated all
the concrete work along the south side of Ronal Road from Greenwood Road to
Glendale Road will be completed by the end of the week.
After a delay in acquiring the necessary parts to complete
the storm sewer improvements Glendale Road, the contractor will again be
installing new storm sewer along Glendale Road this week. It is anticipated
mainline storm sewer will be completed by the end of the week, with storm
sewer service installation the following week.
Thank you again for all your patience, understanding, and
cooperation as you live within a construction area.